The clock is regulatory
EUDR due diligence applies Dec 30 2026 (large/medium) and Jun 30 2027 (micro/small); all four countries are standard risk — full due diligence, plot polygons required [Reg. (EU) 2025/2650].
The 2 a.m. DDS can't miss the shipment: an AI team — geolocation and document agents — matches every satellite polygon to its title record, checks the field logbook in your farm-management system, and assembles the dossier with its full evidence trail. The co-op's compliance lead approves at 6 — before any declaration goes into the EU system.
EUDR due diligence applies Dec 30 2026 (large/medium) and Jun 30 2027 (micro/small); all four countries are standard risk — full due diligence, plot polygons required [Reg. (EU) 2025/2650].
Solinftec launched Alice Multiagentes, six named agents, at Agrishow 2026 [Agrishow/Solinftec, 2026]; Banco do Brasil led Traive's US$20M round for AI rural-credit scoring [Traive, 2025].
DDS acceptance rate; evidence completeness per export; credit-file turnaround. Measured per engagement.
The export-doc reality: plot geolocation with full polygons, five-year evidence retention, title matching across fragmented registries — standard risk means no simplified route for Brazil, Colombia, Peru, or Ecuador. Every coffee, cocoa, soy, and cattle export into the EU needs this. The deliverable IS the audit trail.
| Agtech Operational Feature | Precision-Ag Point Tools | Akana.cloud Virtual Squads |
|---|---|---|
| Traceability | Dashboards, not evidence | DDS assembled with satellite-verified polygons + human sign-off |
| Credit | Bureau-only scoring | Alternative-data files with reviewable trails |
| Alerts | Newsletter pace | Nightly sweeps, human-confirmed |
10 scenario questions drawn from agro-export's real exposures — DDS sign-off, polygon-title matching, five-year evidence, export economics. About 3 minutes. Results weighted to the export operation's realities, with a plain-language action plan for your two weakest dimensions.
Powered by Akana Runtime — field work orders and evidence assembly in live workflows →
60 days — measured on DDS acceptance rate and evidence completeness.
DDS acceptance
First-submission acceptance, vs. resubmission baseline
Evidence completeness
Every plot polygon matched to a title, verified
Turnaround
Days from harvest to submission-ready